Decks & Outdoor Living

Create the ultimate outdoor entertaining area with Auckland's deck building specialists. From custom hardwood decks to complete outdoor kitchens and pergolas, we design and build outdoor spaces that withstand Auckland's coastal weather. 10-year guarantee on all deck construction.

Free Quote & Consultation

Licensed Building Practitioner

Transparent costs, no surprises

FREQUENTLY ASKED QUESTIONS

Do I need building consent for my deck?

Decks over 1.5 metres above ground level, or those attached to the house and more than 1 metre high, typically require building consent in Auckland. Covered decks and those with complex structural elements may also need consent. We assess your specific situation and manage the consent process if required.

What decking material is best for Auckland?

The best material depends on your budget, maintenance preferences, and aesthetic goals. Treated pine is economical and versatile but requires regular maintenance. Hardwoods offer premium appearance and natural durability. Composite decking provides low maintenance with consistent appearance. We discuss options during your consultation.

How long will my deck last?

With proper construction and maintenance, timber decks last 15 to 30+ years depending on material and environmental exposure. Composite decks often carry 25-year warranties. We build all decks to exceed minimum standards, ensuring maximum lifespan and performance.

What maintenance does a deck require?

Timber decks benefit from annual cleaning and re-oiling or staining every 1 to 3 years depending on exposure. Composite decks require minimal maintenance, typically just periodic cleaning. We provide specific care recommendations for your chosen materials.

Can you build a deck on a sloped site?

Absolutely. Auckland's hilly terrain means we regularly build decks on sloped sites. Multi-level designs, stepped access, and proper foundation systems allow us to create beautiful outdoor spaces regardless of your site's topography.

How long does deck construction take?

A standard deck typically takes 1 to 3 weeks to complete, depending on size and complexity. Multi-level decks or those with additional features may require 3 to 6 weeks. Consent processing adds 20 to 30 working days before construction begins.

Create Your Dream Outdoor Space?

Quality decks and outdoor living areas built to last generations.

022 160 0711